Capacity Planning
To determine the required capacity, all you need to do is to schedule the order for open capacity. Additional resources, if required, are temporarily added and the Load Profiles are projected. Next step is to adjust critical load profiles to fit into the existing capacity.  
Planning Board displays the daily capacity requirement and the load profile for each equipment.  Using our  docking tool, you can visually  re-arrange loads, orders,  jobs and processes  to fit within the bounds of installed capacities and  at-the-same-time,  make sure that  maximum overall capacity utilization is achieved
As you re-arrange, changed capacity requirement is displayed on-the-fly. 
In the above example, Job Id. 'Part Two' has been scheduled for open capacity and the rest scheduled for finite capacity.  Capacity requirement profile for  'Part Two'  is as follows.
Please contact support@optiflow-le.com for further clarifications & assistance. 